This photo album illustrates the stages of restoration the church underwent from 2010 to 2016. For background information click here.
- Designated Heritage Building Grants Program grants funded many of our renovations
- Installing cedar shingles (03-Feb-2010)
- Racka Roofing workers installing cedar shingles (03-Feb-2010)
- New cedar shingles on south side (03-Feb-2010)
- Wally & Linda Eliuk preparing new churchyard toilet (06-Jul-2013)
- Wesley Gushuliak preparing base for new churchyard toilet (06-Jul-2013)
- Installation of new windows – south side (23-Sep-2013)
- Removal of old windows from north side (23-Sep-2013)
- Removal of old window from southeast side (23-Sep-2013)
- Newly installed north side window – interior view (23-Sep-2013)
- Newly installed south side windows (09-Oct-2013)
- Newly installed west side windows (09-Oct-2013)
- Newly installed window (31-Jul-2015)
- Rebuilding cedar steps – Randy Hirschfield (20-Oct-2013)
- Rebuilding cedar steps (l-r) Randy Hirschfield, Wally Eliuk (20-Oct-2013)
- Taking a break from rebuilding from work (l-r) Janet Bjornson, Wesley Gushuliak, Theresa Happychuk, Johanna Stasiuk, Terry Bjornson, Randy Hirschfield, Wally Eliuk (20-Oct-2013)
- Rebuilt cedar steps (20-Oct-2013)
- Newly installed exterior doors (24-Oct-2014)
- Vestibule renovation (26-Feb-2015)
- Reinstalling the original sunburst. (l-r) Terry Bjornson, Wesley Gushuliak, Blaine Alexiuk (25-Jul-2015)
- The proud crew after reinstalling the original sunburst (l-r) Terry Bjornson, Blaine Alexiuk, Wesley Gushuliak, Randy Hirschfield (25-Jul-2015)
- The newly reinstalled sunburst over the front entrance (25-Jul-2015)
- The newly reinstalled sunburst over the front entrance (25-Jul-2015)
- Madani Group workers refinishing stucco on south side (27-Aug-2015)
- Stucco refinishing on west side (27-Aug-2015)
- Stucco refinishing on west side (27-Aug-2015)
- Madani Group workers refinishing stucco on north side (27-Aug-2015)
- Stucco refinishing complete (27-Aug-2015)
last updated: 20-May-2016